Enterprise Redesign 2020 Pt. 02

Just a quick update before I go to work. I’ve redone the whole bridge area. I wasn’t happy with the look I had previously, so I redid the bridge to one inspired by the Phase II model that was being built 42 years ago. I also redid the B deck structure beneath and added a swoopy spoony thing (technical term) that goes back to the impulse area.

Enterprise_2020_WIP005

Enterprise_2020_WIP006

3 responses to “Enterprise Redesign 2020 Pt. 02

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google photo

You are commenting using your Google account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s